Sample case
Ash Street Bath
- Kind
- Bath
- Place
- Metro
- Duration
- 7 weeks

Scope
Tile, a rebuilt vanity, and a glass shower in the hall bath.
The old tub went. The room finally fits.
The hall bath was the tight one: a tub nobody used, a vanity that blocked the door, and tile that had already given up. We kept the house’s other bath open the whole time.
Waterproofing first, then tile, then the glass. The vanity was built to the wall that was actually there, not to a catalog width.
Sample case — replace the copy and photographs with the real job.


