Sample case
Linden Built-ins
- Kind
- Finish work
- Place
- Metro
- Duration
- 5 weeks

Scope
Shelves and trim built on site for the bedroom wall.
Painted in place. No prefab unit.
The wall was not square, and a store unit would have shown the gap. We scribed the shelves and the trim to the plaster that was already there.
Paint went on in the room, not in a shop. The rest of the bedroom stayed furnished. Five weeks, one lead, a punch list walked with the owner.
Sample case — replace the copy and photographs with the real job.
On the walls
Other houses


